Work on the Mosel bridge / B53 (“Autobrücke”) will start on 02.11.2024
Work will soon begin on the renewal of the road crossing structures on the Zell Mosel bridge. Currently, the traffic guidance devices are being installed on the Zell and Kaimt sides of the motorway bridge.
The actual work to replace the expansion joints will then start on November 2nd and is expected to last until April 2025.
All information on the construction phases and the planned traffic routing can be found on the LBM Cochem-Koblenz website: